How Much Does Site Feasibility Cost per New Location, and Is There AI That Does It?

A consultant site feasibility is priced by scope, so its cost is the disciplines you order. An AI desk feasibility does the zoning and economics first, in about half an hour per site at the measured median. What each part covers and what still needs a consultant.

A consultant's site feasibility is priced by scope, such as zoning, survey, environmental, traffic and market work, so the honest per-site figure is the quote for the disciplines you order. An AI desk feasibility covers the zoning and economics part first, before you pay for the rest: Titleman, for example, returns what the zoning allows, the schemes that fit and a live Excel with cost and return for each in about half an hour per site at the measured median; it does not print its price on this page and does not replace a survey, a title commitment or an environmental report.

Published by Titleman, which makes one of the tools compared. Updated 19 October 2026.

Who does each part of a site feasibility

PartUsually done byCan a desk AI run do it?
Zoning: district, FAR, height, maximum buildable areaPlanner or land use counselYes, each figure with its source
Schemes and economics: cost and return per optionDevelopment consultantYes, in a live Excel; up to ten schemes, each loser says why
Ownership and history: owner of record, salesTitle companyThe record, yes; the title commitment, no
Prototype fit: building, parking, drive aislesArchitect or civil engineerPartly: the maximum buildable area on paper; the test fit stays with them
Survey, geotechnical, Phase I, trafficSurveyor, engineers, environmental consultantNo

The split is the point. The reports in the last row are ordered and paid site by site, and a desk run tells you which sites are worth ordering them for.

What it costs in time: a feasibility run takes about half an hour at the median on production runs in the 30 days to 13 October 2026, with one run in ten above about 75 minutes. Twenty sites, one by one, is about 10 hours of run clock: arithmetic on the median, not a measured batch.

An order of work that spends on survivors only

  1. Run the desk feasibility on every candidate with the same prototype brief.
  2. Drop the sites the zoning or the economics rule out, with the reason written down.
  3. Order survey, title, Phase I and traffic only for the sites that survive.
  4. Visit the short list with the open items in hand.

A three-site chain screen is worked through on one finished run in screening 20 sites in a week, and the six questions chain teams ask are in site feasibility for a new location. Other tools by job are in AI tools for commercial real estate, and the team page is Titleman for corporate real estate.

FAQ

What does an AI site feasibility include?

Zoning figures with sources, ranked schemes, a 19-sheet live Excel, a memo, a zoning report and the evidence.

How long would 20 candidate sites take?

About 10 hours of run clock at the median, one by one. That is arithmetic, not a measured batch.

Which site reports still need a consultant?

Survey, title commitment, Phase I, geotechnical, traffic and the architect's test fit.

Request a demo with three candidate sites and your prototype brief.

Send three candidate sites and your prototype brief

Request a demo