Solution

Feasibility Study Specification: Inputs, Outputs, Measured Time and Limits

What a Titleman feasibility study takes in, what it returns (verdict, study sections, live-formula workbook), the measured time (median about 28 minutes), the file limits and what it does not do.

Titleman Feasibility studies a development site from an address: what the parcel allows, the approval path, what to build and what the land is worth. Across completed production runs in the 30 days to 18 October 2026, the median time from the request to the delivered files was about 28 minutes.

Published by Titleman, which makes the product described. Updated 22 October 2026.

Specification at a glance

ItemSpecification
JobZoning envelope, buildable area, cost and revenue assumptions and a residual land value
InputA street address; optional documents
Site sizeUp to eight parcels joined into one site
Documents readText PDFs, up to 25 MB each, eight files
OutputsVerdict, study in six sections, Excel workbook with live formulas
Median timeAbout 28 minutes (30 days to 18 October 2026)
Slowest tenthLonger than about 72 minutes
AccuracyNo error rate measured on real client deals

Inputs

InputNotes
Street address, cityEnough to start. The parcel is found and drawn on the map with its zoning and size
Neighboring lotsAdd up to eight parcels to one site
Survey, title commitment, appraisalOptional. Figures read from them replace the records'
ProgramUnit mix, target size and phasing, if you have them
Cost assumptionsBuild cost moves the result most; yours replace ours

Text PDFs are read. Scans, Word, Excel and image files are attached by name and are not read.

Outputs

  • The verdict: what to build and what to bid.
  • The study, in sections: Answer, Approval path, What to build, What you can pay, The site, Proof and gaps.
  • The workbook, XLSX with live formulas: summary, assumptions, development budget, sources and uses, land residual and returns, sensitivity when the run builds one, and the sources.

Measured time

The clock is the time from the request to the delivered files, over completed production runs created in the 30 days to 18 October 2026, the same clock for every product. For feasibility it gave a median of about 28 minutes, and one run in ten took longer than about 72. The spread is wide: plan for the slow end on anything time-critical.

Limits

  • Local planning rules. Density, height, parking minimums and tenure conventions are not applied automatically. If your answer turns on one, state it in the brief.
  • Files. Only text PDFs are read, and only within the size and count above.
  • Parcels. A site holds up to eight parcels.
  • Gaps are named. What the run could not establish is listed under Proof and gaps, not filled in.

What it does not replace

Feasibility does not replace the planning authority's zoning confirmation, an entitlement attorney, an architect or an engineer, or a licensed appraisal. It tells you what the site appears to allow and what the land might be worth under stated assumptions, so you know what to take to those professionals.

How these figures were measured

Source: run records of the Titleman AI engine, completed production runs created in the 30 days to 18 October 2026, timed from the request to the delivered files. The median is rounded up to the whole minute. Accuracy has not been measured against real client deals, and no accuracy figure is claimed.

Frequently asked questions

How long does it take? A median of about 28 minutes, and one run in ten longer than about 72, in the 30 days to 18 October 2026.

What do I need? A street address. Documents are optional.

How many parcels and files? Up to eight parcels; text PDFs up to 25 MB, eight files.

What comes back? A verdict, the study in sections and a workbook with live formulas.

Does it replace an entitlement review? No.

To run a study on your own site, request a demo. A longer description is in land feasibility software.

Run a feasibility study on a site you are looking at

Request a demo